2012年ACCA考试《F9财务报告》讲义辅导(2)

  Basic information
  To appraise an investment project, the appraiser must have information about the following relevant areas:

  1 Cost of investment project.

  2 Estimated life ofproject.来自www.Examw.com

  3 Estimated net cash inflows from project.

  4 Estimated residual value of project at the end of its life if applicable.

  5 Costofcapital.中华考试网

  6 Taxation implications of project.

  7 Inflation rates and effect on project.

  Anyone who has had to plan for a future activity/event should understand that the future is never certain. Bearing this in mind, one must try to predict the future by drawing from past experience and using available information either from published statistics or from other sources. Some of the data required about the project would have to be estimated taking into consideration all available information. The accuracy of these estimated data would have a consequential effect on the final result of the decision, as such care must be taken in making these estimates.

  Methods of investment appraisal

  When the decision-maker has at his/her disposal basic information about the project as stated above, he/she is then ready to use one or more of the four main methods used in appraising investment projects.

关于高顿 | 市场合作 | 高顿部落 | 高顿财税学院 | 免责条款 | 快捷支付 | 联系我们 | 高顿招聘 | HI实习 | 员工验证 | 侵权举报
CopyRight © 2006-2021 Gaodun.cn All Rights Reserved. 上海高顿教育科技有限公司 版权所有
高顿财经
沪ICP备14038153号-9 沪公网安备31010902001401号
教育行业诚信金牌认证单位